Engineering Excellence
since 1936
X
Corporate Banner

  • The scope of the project included a complete replacement of the building facades to improve thermal performance, a new four-story addition that connects the two buildings, extension of the floor plates at the building perimeter, and various smaller additions to improve circulation.
  • Core improvements include new lighting, renovation of all existing toilet rooms, and code-related improvements to the existing stair towers. The existing central plant equipment in the power house remained. Interior fit-out work was performed by Jacobs Engineering Group
  • Preparation of the necessary modeling and administration for LEED certification. Received LEED Platinum under the LEED 2009 for Core and Shell Development Rating System.
  • Preparation and submission of the PECO Smart Construction Incentive for Whole Building Design.

New Jersey
10 Melrose Avenue, Suite 430
Cherry Hill, New Jersey 08003
Pennsylvania
One Pitcairn Place, Suite 2200
165 Township Line Road
Jenkintown, Pennsylvania 19046
Connect With Us